Pre-production done

Over 170 pages of documentation handed in. A massive collection of work, and now to turn our attention to production. Eric, Pat and myself are having a beard-off for the duration of production, none of us are allowed to shave till the game is made, and the production along with beard growth is going to be documented on my new video camera.

As of monday, production commences, working 10-5 every day and treating it like a job will mean we have a constant flow of work and predictable timetable and schedule.

Game Document PDF found here:

http://www.box.net/shared/ao1hv2ca5f

(5mb)

Comments

Popular posts from this blog

New year, new reguime

Yell advertising campaign